How to install Hybrid SPC Flooring
To install click system hybrid flooring, you will need the following tools and materials:
- Measuring tape
- Underlayment
- Hybrid flooring planks
- Tapping block or pull bar
- Mallet
Steps:
- Prepare the subfloor by ensuring it’s clean, flat, and dry
- Roll out underlayment and cut to size
- Measure the room and calculate the number of planks needed
- Start laying the first row by aligning the tongue and groove of the first plank
- Secure the first plank by tapping it into place with a tapping block or pull bar and mallet
- Connect the remaining planks in the first row using the click system
- Repeat the process for subsequent rows, making sure to stagger the end joints
- Trim the final row to size if necessary
- Allow the flooring to acclimate to the room for at least 24 hours before using.
Note: Always refer to the manufacturer’s instructions for specific guidelines and recommended tools.